Publications

https://haltools.archives-ouvertes.fr/Public/afficheRequetePubli.php?aut...

 

International journals

1. A. AGNETIS, C. BRIAND, S. U. NGUEVEU, P. SUCHA. Price of anarchy and price of stability in multi-agent project scheduling, Annals of Operations Research, 285, pp 97–119, 2019

2. Y. HE, C. ARTIGUES, C. BRIAND, N. JOZEFOWIEZ, S.U. NGUEVEU. A Matheuristic with Fixed-sequence Re-optimization for a Real-life Inventory Routing Problem. Accepted, Transportation Science, 2019.

3. C. BRIAND, Y. HE, S.U. NGUEVEU. Energy-efficient planning for supplying assembly lines with vehicles. EURO Journal on Transportation and Logistics, Springer, 2018.

4. C. BRIAND, S.U. NGUEVEU, P. SUCHA. Finding a minimum-makespan Nash equilibrium to the multiagent project scheduling problem. Journal of Scheduling, Vol.20, N°5, pp 475–491, 2017.

5. N. CHAABANE, A. AGNETIS, C. BRIAND, M.-J. HUGUET. Finding a Nash Equilibrium and an optimal sharing policy for multi-agent network expansion game. Networks, Vol.69, N°1, pp.94-109, 2017.

6. A.A. MEKONNEN, F. LERASLE, A. HERBULOT, C. BRIAND. Incorporating computation time measures during heterogeneous features selection in a boosted cascade people detector. International Journal of Pattern Recognition and Artificial Intelligence, Vol.30, N°8, 2016.

7. A. AGNETIS, C. BRIAND, J.-C BILLAUT, P. SUCHA. Nash equilibria for the multiagent project scheduling problem with controllable processing times. Journal of Scheduling, Volume 18(1), pp 15-27, 2015.

8. C. BRIAND, S. OURARI. Minimizing the number of tardy jobs for the single machine scheduling problem: MIP-based lower and upper bounds. RAIRO - Operations Research, Vol.47, N°1, pp 33-46, 2013.

9. T. GARAIX, C. ARTIGUES, C. BRIAND. Fast minimum float computation in activity networks under interval uncertainty. Journal of Scheduling, Vol.16, N°1, pp.93-103, 2013.

10. C. BRIAND, S. OURARI, B. BOUZOUIA. An efficient ILP formulation for the single machine scheduling problem. RAIRO - Operations Research, Vol.44, N°1, pp.61-71, 2010.

11. C. ARTIGUES, C. BRIAND. The resource-constrained activity insertion problem with minimum and maximum time lags. Journal of Scheduling, Vol. 12, No 5, pp447-460, 2009.

12. C. BRIAND. A new Any-Order schedule generation scheme for resource-constrained project scheduling. RAIRO - Operations Research, Vol. 43, No 3, pp 297-308, 2009.

13. C. BRIAND, H.T. LA, J. ERSCHLER. A robust approach for the single machine scheduling problem. Journal of Scheduling, Vol.10, N°3, pp.209-221, 2007.

14. C. BRIAND, H.T. LA, J. ERSCHLER. A new sufficient condition of optimality for the two-machine flowshop problem. European Journal of Operational Research – Vol.169, N°3, pp.712-722, 2006. 

15. C. BRIAND. Using Petri nets for constraint satisfaction. Int. Journal of Decision Systems, Vol.9, no 1, pp.77-97, 2000.

 

National Journals

16. E. DESPONTIN, C. BRIAND, P. ESQUIROL. Aide à la décision pour une coopération interentreprise - Journal Européen des Systèmes Automatisés, vol. 39, pp 797-816, 2005.

17. E. DESPONTIN, C. BRIAND, P. ESQUIROL. Aide à la coopération inter-entreprise pour la production à la commande - Document Numérique –- vol. 8, pp. 23-36, 2004.

 

Book chapters

18. Y HE, C. BRIAND, N JOZEFOWIEZ. Inventory Routing with Explicit Energy Consumption: A Mass-Flow Formulation and First Experimentation. Operations Research and Enterprise Systems, Springer, pp.96-116, 2017.

19.  C. ARTIGUES, C. BRIAND, T.GARAIX. Temporal analysis of projects under interval uncertainty, Handbook on Project Management and Scheduling, Volume 2, Springer, N°ISBN 978-3-319-05914-3, 2015, pp.911-927

20. N. CHAABANE, C. BRIAND, M.-J HUGUET. Nash Equilibria for multi-agent network flow with controllable capacities Communications in Computer and Information Science, Springer Verlag, Operations Research and Enterprise Systems, 509, pp.47-62, 2015.

21. C. BRIAND, M.-J HUGUET, H.-T LA, P. LOPEZ. Constraint-based approaches for robust scheduling, Ed. ISTE Wiley, Control Systems, Robotics and Manufacturing Series, No ISBN 978-1-84821-054-7, pp. 199-226, 2008.

22. C. ARTIGUES, C. BRIAND. Activity Insertion Problem in a RCPSP with Minimum and Maximum Time Lags, chapter in Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications, ISTE Publishing Company, ISBN: 9781848210349, 2007, pp171-190.

23. C. BRIAND, M.-J HUGUET, H.-T LA, P. LOPEZ. Approches par contraintes pour l’ordonnancement robuste, chapitre dans Flexibilité et Robustesse en Ordonnancement, Hermes Science Publication, Traité IC2, ISBN 2-7462-1028-2, 2005, pp. 191-215.

24. C. ARTIGUES, C. BRIAND, M.-C PORTMANN, F. ROUBELLAT. Pilotage d'atelier basé sur un ordonnancement flexible, chapitre dans Méthodes du pilotage des systèmes de production, Ed. Hermes Science, Traité IC2 Information-Commande-Communication, No ISBN 2-7462-0514-9, 2002, pp.61-97.

 

Peer-reviewed International Conferences

25. Q. FABRY, A. AGNETIS, L. BERGHMAN, C. BRIAND. On the complexity of the crossdock truck-scheduling problem, 17th Workshop on Project Management and Scheduling, April 15-17, 2020, Toulouse, France.

26. Y HE, T. BEKTAS, C. BRIAND, N JOZEFOWIEZ. A continuous time inventory routing problem with energy minimization, 12th International Conference on Modelling, Optimization and Simulation (MOSIM 2018), June 27-29, 2018, Toulouse, France.

27. A. AGNETIS, L. BERGHMAN, C. BRIAND. The truck scheduling problem at cross docking terminals: Formulations and valid inequalities, 16th Int. Conference on Project Management and Scheduling, April 17-20, 2018, Roma, Italy.

28. C. BRIAND, J.C. NDIAYE, R. PARLOUAR. A MILP formulation for multi-robot pick-and-place scheduling, 16th Int. Conference on Project Management and Scheduling, April 17-20, 2018, Roma, Italy.

29. F.R. BARBOSA-ANDA, C. BRIAND, F. LERASLE, A.A. MEKONNEN. Soft-Cascade Learning with Explicit Computation Time Considerations WACV 2018, IEEE Winter Conf. on Applications of Computer Vision, March 12-14, 2018, Lake Tahoe, USA.

30. Y. HE, C. BRIAND, N. JOZEFOWIEZ. A Mass Flow Based MILP Formulation for the Inventory Routing with Explicit Energy Consumption, VeRoLog 2016: annual workshop of the EURO working group on Vehicle Routing and Logistics optimization, 6-8 June 2016, Nantes, France.

31. F.R. BARBOSA-ANDA, C. BRIAND, F. LERASLE, A.A. MEKONNEN. Mean Response-Time Minimization of a Soft-Cascade Detector. International Conference on Operations Research and Enterprise Systems (ICORES 2016), February 23-25, 2016, Rome (Italie), 12p.

32. Y. HE, C. BRIAND, N. JOZEFOWIEZ. A Mass-flow Based MILP Formulation for the Inventory Routing with Explicit Energy Consumption. International Conference on Operations Research and Enterprise Systems (ICORES 2016), February 23-25, 2016, Rome (Italie), 12p.

33. L. BERGHMAN, C. BRIAND, R. LEUS, P. LOPEZ. The truck scheduling problem at crossdocking terminals - exclusive versus mixed mode. International Conference on Operations Research and Enterprise Systems (ICORES) Lisbonne (Portugal), 2015, 8p. Best application paper award.

34. M. MUGUERZA, C. BRIAND, N. JOZEFOWIEZ, S.U. NGUEVEU, V. RODRIGUEZ, M.U. MORIS. A mass-flow MILP formulation for energy-efficient supplying in assembly lines. Multidisciplinary International Scheduling Conference: Theory & Applications (MISTA 2015), Aug 2015, Prague, Czech

35. N. CHAABANE, C. BRIAND, M.J. HUGUET. Finding stable flows in multi-agent networks under an equal-sharing policy. International Network Optimization Conference (INOC), Warsaw (Pologne), Mai 2015, 8p.

36. N. CHAABANE, C.  BRIAND, M.J.HUGUET. A multi-agent min-cost flow problem with controllable capacities: complexity of finding a maximum-flow nash equilibrium, International Conference on Operations Research and Enterprise Systems (ICORES), March 06-08, Angers (France), Best Student Paper Award, 2014.

37. A.A. MEKONNEN, C. BRIAND, F. LERASLE, A. HERBULOT. Fast HOG based person detection devoted to a mobile robot with a spherical camera, Intelligent Robots and Systems (IROS), November 2013, pp.631-637.

38. C. BRIAND, S.U .NGUEVEU, P. SUCHA. Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, Multidisciplinary International Scheduling Conference: Theory & Applications (MISTA), 27-30 August 2013, Ghent (Belgique).

39. C. BRIAND, A. AGNETIS, J.-C. BILLAUT. The multiagent project scheduling problem: complexity of finding a minimum-makespan Nash equilibrium, 13th Int. Conference on Project Management and Scheduling, Leuven, Belgium, 1-4 April, 2012.

40. L. BERGHMAN, C. BRIAND, R. LEUS, P. LOPEZ. The truck scheduling problem at cross-docking terminals, 13th Int. Conference on Project Management and Scheduling, Leuven, Belgium, 1-4 April, 2012.

41. C. BRIAND, J.-C. BILLAUT. Cooperative project scheduling with controllable processing times: a game theory framework, IEEE Emerging Technologies and Factory Automation, Toulouse (France), 5-9 September, 2011

42. T. GARAIX, C. ARTIGUES, C. BRIAND. Fast minimum float computation in activity networks under interval uncertainty, 10th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP'2011), Nymburk, Czech Republic, 19-24 June 2011.

43. C. BRIAND, T. LEHAUX. A fair multi-agent shop scheduling problem, Uncertainty and Robustness in Planning and Decision Making (URPDM 2010), Coimbra (Portugal), 15-17 April, 2010, 6p.

44. C. BRIAND, T. LEHAUX. The multi-agent project scheduling problem: the fair share of stress. 12th International Workshop on Project Management and Scheduling (PMS'2010), Tours (France), 26-28 April, 2010.

45. S. OURARI, C. BRIAND, B. BOUZOUIA. Minimizing the number of tardy jobs in single machine scheduling using MIP", 4th Multidisciplinary International Scheduling Conference : Theory and Applications, Dublin (Ireland), 10-12 August, 2009.

46. C. BRIAND, S. OURARI, B. BOUZOUIA. A cooperative approach for job shop scheduling under uncertainties", International Conference on Collaborative Decision Making (CDM'08), Toulouse (France), 1-4. July, 2008, p5-15.

47. C. ARTIGUES, C. BRIAND, Complexity of activity insertion for resource-constrained project scheduling with minimum and maximum time lags. 8th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP'2007), Istanbul (Turquie), 2-6 July, 2007.

48. C. BRIAND, S. OURARI, B. BOUZOUIA. A new dominance condition for mono-pyramidal single machine scheduling problems. 8th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP'2007), Istanbul (Turquie), 2-6 July, 2007.

49. C. BRIAND, S. OURARI. Minimizing the number of late jobs in single machine scheduling with nested execution intervals. IEEE International Conference on Service Systems & Service Management (ICSSSM'06), Troyes (France), 25-27 October, 2006, pp.1172-1177

50. C. BRIAND, J. BEZANGER. An any-order SGS for project scheduling with scarce resources and precedence constraints. 10th International Workshop on Project Management and Scheduling (PMS'2006), Poznan (Pologne), 26-28 April, 2006, pp.95-100

51. E. MONSARRAT-DESPONTIN, C. BRIAND, P ESQUIROL. A decision support framework for cooperation in make-to-order production, 6th International Conference on the Design of Cooperative Systems (COOP’04), May 11-14 2004, pp 69-82, French-Riviera, France.

52. C. BRIAND, H.T. LA, J. ERSCHLER. Robust scheduling for the two-machine flowshop problem, 9th International Workshop on Project Management and Scheduling (PMS'04), April 2004, pp 371-374, Nancy.

53. C. BRIAND, E. MONSARRAT-DESPONTIN, F.ROUBELLAT. Scheduling with time lags and preferences: a heuristic. 8th Int. Workshop on Project Management and Scheduling, Valence (Espagne), 3-5 April, 2002, pp.77-80.

54. C. BRIAND, P. ESQUIROL. Task charts: a time model for the specification of alternative processes. Int. Conference on Industrial Engineering and Production Management, Quebec (Canada), 20-23 August, 2001, 10p

55. C. BRIAND. Solving the car-sequencing problem using Petri nets. International Conference on Industrial Engineering and Production Management (IEPM'99), Glasgow (GB), 12-15 Juky, 1999, Vol.1, pp.543-551 

56. C. BRIAND, P. ESTEBAN. An object-oriented and a Petri net based approach for real time control of flexible manufacturing systems. 4th INRIA/IEEE Symposium on Emerging Technologies and Factory Automation (ETFA'95), Paris (France), 10-13 October, 1995, pp.115-123

57. C. BRIAND, D.ANDREU. HOOD/PNO design of a batch process control system. Workshop on Object-Oriented Programming and Models of Concurrency, Turin (Italie), 27 June, 1995, 8p 

58. C. BRIAND, P. ESTEBAN, M. PALUDETTO. Flexible manufacturing system design using object and Petri net concepts. 1st IFAC Workshop New Trends in Design of Control Systems, Smolenice (Slovaquie), 7-10 September, 1994, pp.362-367