| [1] | Claude Yugma, Christian Artigues, Stéphane Dauzère-Pérès, Alexandre Derreumaux, and Olivier Sibille. A batching and scheduling algorithm for the diffusion area in semiconductor manufacturing. International Journal of Production Research, 2011. doi:10.1080/00207543.2011.575090. [ bib | http ] |
| [2] | Alain Haït and Christian Artigues. On electrical load tracking scheduling for a steel plant. Computers and Chemical Engineering, 35(12):3044-3047, 2011. [ bib | http ] |
| [3] | Thierry Garaix, Christian Artigues, Dominique Feillet, and Didier Josselin. Optimization of occupancy rate in dial-a-ride problems via linear fractional column generation. Computers and Operations Research, 38(10), 2011. [ bib | http ] |
| [4] | A. Haït and C. Artigues. A hybrid CP/MILP method for scheduling with energy costs. European Journal of Industrial Engineering, 5(4):471-489, 2011. [ bib | http ] |
| [5] | O. Koné, C. Artigues, P. Lopez, and M. Mongeau. Event-based MILP models for resource-constrained project scheduling problems. Computers and Operations Research, 38(1):3-13, 2011. [ bib | http ] |
| [6] | Christian Artigues, Marie-José Huguet, and Pierre Lopez. Generalized disjunctive constraint propagation for solving the job shop problem with time lags. Engineering Applications of Artificial Intelligence, 24(2):220-231, 2011. [ bib | http ] |
| [7] | L. Houssin, C. Artigues, and E. Corbel. Frequency allocation problem in a sdma satellite communication system. Computers and Industrial Engineering, 61(2):346-351, 2011. [ bib | http ] |
| [8] | Christian Artigues, Eric Bourreau, Hasan-Murat Afsar, Olivier Briant, and Mourad Boudia. Disruption management for commercial airlines: Methods and results for the roadef 2009 challenge. to appear in European Journal of Industrial Engineering, 2011. [ bib | http ] |
| [9] | Christian Artigues, Pierre Lopez, and Alain Haït. The energy scheduling problem: Industrial case study and constraint propagation techniques. International Journal of Production Economics, 2010. doi:10.1016/j.ijpe.2010.09.030. [ bib | http ] |
| [10] | B. Gacias, C. Artigues, and P. Lopez. Parallel machine scheduling with precedence constraints and setup times. Computers and Operations Research, 37(12):2141-2151, 2010. [ bib ] |
| [11] | T. Garaix, C. Artigues, D. Feillet, and D. Josselin. Vehicle routing problems with alternative paths: an application to on-demand transportation. European Journal of Operational Research, 204(1), 2010. [ bib ] |
| [12] | B. Bontoux, C. Artigues, and D. Feillet. A memetic algorithm with a large neighborhood crossover operator for the generalized traveling salesman problem. Computers and Operations Research, 37(11):1844-1852, 2010. [ bib ] |
| [13] | M. A. Aloulou and C. Artigues. Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case. Computers and Operations Research, 37(5), 2010. [ bib ] |
| [14] | R. Elizondo, V. Parada, L. Pradenas, and C. Artigues. An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport. Journal of Heuristics, 16(4):575-591, 2010. [ bib | http ] |
| [15] | C. Artigues and C. Briand. The resource-constrained activity insertion problem with minimum and maximum time lags. Journal of Scheduling, 15(5):447-460, 2009. [ bib | http ] |
| [16] | C. Artigues, M. Gendreau, L. M. Rousseau, and A. Vergnaud. Solving an integrated employee timetabling and production scheduling problem via hybrid branch-and-bound. Computers and Operations Research, 36(8):2330-2340, 2009. [ bib | http ] |
| [17] | A. Dupont, A. Linhares, C. Artigues, D. Feillet, P. Michelon, and M. Vasquez. The dynamic frequency assignment problem. European journal of Operational Research, 195(1):75-88, 2009. [ bib ] |
| [18] | C. Artigues and D. Feillet. A branch and bound method for the job-shop problem with sequence dependent setup times. Annals of Operations Research, 159(1):135-159, 2008. [ bib | http ] |
| [19] | M. Palpant, C. Oliva, C. Artigues, P. Michelon, and M. Didi Biha. Models and methods for frequency allocation with cumulative interference constraints. International Transactions in Operational Research, 15(3):307-324, 2008. [ bib | http ] |
| [20] | C. Solnon, V. D. Cung, A. Nguyen, and C. Artigues. The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem. European Journal of Operational Research, 191(3):912-927, 2008. [ bib | http ] |
| [21] | T. Garaix, D. Josselin, D. Feillet, E. Castex, and C. Artigues. Transport à la demande points à points en zone peu dense. proposition d'une méthode d'optimisation de tournées. CyberGeo: European Journal of Geography, 2007. article 396. [ bib | .html ] |
| [22] | C. Artigues, P. Lopez, and P.D. Ayache. Schedule generation schemes and priority rules for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis. Annals of Operations Research, 138(1):21-52, 2005. [ bib | http ] |
| [23] | S. Demassey, C. Artigues, and P. Michelon. Constraint propagation-based cutting planes : an application to the resource-constrained project scheduling problem. INFORMS Journal on computing, 17(1):52-65, 2005. [ bib ] |
| [24] | C. Artigues, J.C. Billaut, and C. Esswein. Maximization of solution flexibility for robust shop scheduling. European Journal of Operational Research, 165(2):314-328, 2005. [ bib ] |
| [25] | M. Palpant, C. Artigues, and P. Michelon. LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search. Annals of Operations Research, 131:237-257, 2004. [ bib ] |
| [26] | C. Artigues, P. Michelon, and S. Reusser. Insertion techniques for static and dynamic resource constrained project scheduling. European Journal of Operational Research, 149(2):249-267, 2003. [ bib ] |
| [27] | C. Artigues and F. Roubellat. An efficient algorithm for operation insertion in practical jobshop schedules. Production Planning and Control, 13(2):175-186, 2002. [ bib ] |
| [28] | C. Artigues and F. Roubellat. A petri net model and a general method for workshop real time scheduling with setup times. International Journal of Production Economics, 74(1-3):63-75, 2001. [ bib ] |
| [29] | C. Artigues and F. Roubellat. A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research, 127(2):297-316, 2000. [ bib ] |
| [30] | C. Artigues, F. Roubellat, and J.C. Billaut. Characterization of a set of schedules in a resource-constrained multi-project scheduling problem with multiple modes. International Journal of Industrial Engineering, 6(2):112-122, 1999. [ bib ] |
| [31] | F. Roubellat, C. Artigues, and M. Villaumié. Un système interactif d'aide à la décision pour l'ordonnancement en temps réel d'atelier. La Revue Française de Gestion Industrielle, 17(4):5-20, 1998. [ bib ] |
This file was generated by bibtex2html 1.96.